Construction Manager
13 days ago
Ability to develop and understand cost estimates, broken down at a minimum to prime and subcontractor labor, equipment, materials, overhead, and profit; evaluate proposals broken down to this level; define and document scope changes, either required by the owner or a result of a differing site condi